New Addition at CHS

Posted on April 15th, 20175:57 pm


New Addition at CHS

A recent Omaha World Herald shared plans of the new addition at CHS.  Work is scheduled to begin this summer. The addition will house a new library, a black box theater — a sparse, box-like performing space that allows for flexible sets — visual and performing arts, instrumental and vocal music and drama classes. The school’s current library, vocal music and drama spaces have not been significantly updated since the 1930s. Read Full Article.

Keep up with the addition on the CHS Foundation web page.